Products / NAVCEL
NAVCEL

The Tool to Effectively Manage Your Fleet

Real-time location, geofences, alarms, and reports for fleets of any size.

NAVCEL monitoring panel: real-time location of an urban fleet in Chihuahua.

NAVCEL monitoring panel: real-time location of an urban fleet in Chihuahua.

The Challenge

Companies with fleets of any size face these challenges:

  • Real knowledge of unit routes.
  • Compliance with assigned routes.
  • Knowledge of fuel consumption.
  • Actual hours worked by operators.
  • Early fault detection.

The Solution

Specialized electronic equipment is installed on units and integrated into a cellular or satellite communication network. Web and mobile applications provide access to all the information the system offers:

  • Real-time location of units.
  • Vehicle route history.
  • Virtual geofences to detect improper use of units in real time.
  • Compliance with assigned routes.
  • Kilometers traveled per unit.
  • Historical data storage.
  • Real-time equipment self-diagnostics (if equipped).
  • Immediate alarm detection (panic button).
  • Fuel consumption report (if the accessory is installed).
  • Detection of poor driving behavior.

Benefits

  • Reduced operating costs.
  • Simplified fleet management.
  • Reduced administrative staff.
  • Detection of poor-performing operators.
  • Detection of unit misuse.
  • Recovery in case of theft.
  • Reduced accidents.
  • Extends unit service life.
  • Improved service to customers.
  • Insurance savings.

Want to manage your fleet from one place?

Contact Us